Location
Selama, Perak
|
FACT SHEET
Location
Selama, Perak
Owner
Kerian Energy Sdn Bhd
Consultant
SMEC (M) Sdn Bhd
Completion Date
2nd May 2017
The proposed Project will be run-of-the-river scheme involving two
separate powerhouses with total installed capacity of approximately 14MW. The upper scheme
feeds Bintang Powerhouse (6.4MW), fed by an intake on Sg. Bintang and a second intake on Sg
Kerian via two separate penstock pipelines. The lower scheme comprises Kerian Powerhouse
(7.6MW), which is fed by the tailrace flow from Bintang Powerhouse.
a) Intakes
c) Powerhouses
d) Civil Works
e) Mechanical & Hydromechanical Works
f) Electrical Works
|